Skip to main content

Heron House, Aylesbury

D-Drill head to Aylesbury

D-Drill were called in to a disused office block in Aylesbury to assist in compiling a survey of the existing structural integrity of the building.

The challenges were that there were no lifts, limited power and having to work around other trades.

An indepth report of numerous scans were made throughout the building, Core sampling and Chemical Analysis of the concrete structure were also undertaken.

The Site Agent was very happy with the professional way D-Drill conducted the works.

Back to Projects