Skip to main content

Eastern Link Road, Cardiff

Wall sawing on a link road in Wales

D-Drill were asked to cut the top off a 13 metre section of retaining roadside wall on the new link road so that our client could make some modifications to it.

To achieve this we used the Hilti Tracksaw and a Cut and break saw, The work involved some unusual set ups as the photos show the wall was 500mm thick so this meant that a 1200mm blade was used to achieve the correct depth.

The work was undertaken over the course of 2 days and completed successfully.

Back to Projects