Skip to main content

Projects

Industrial Unit, Coventry

Industrial Unit, Coventry

Precision Required when D-Drill Successfully Remove Mezzanine Floor D-Drill was contracted to carefully remove a 108 tonne...

Dundee Harbor

Dundee Harbor

D-Drill tackles the tide to prevent future flooding D-Drill successfully drilled holes in a harbour wall in Dundee to insert...

Jaguar Land Rover, Gaydon

Jaguar Land Rover, Gaydon

D-Drill remove edge of reinforced concrete wall D-Drill were called out to the Jaguar Land Rover site in Gaydon to remove the...

Southampton Hospital

Southampton Hospital

D-Drill quietly removes Southampton Hospital roof Any drilling work at a hospital requires critical control of the noise level...

Chocolate Factory, Chester

Chocolate Factory, Chester

D-Drill Bites into Concrete Biscuit at Chocolate Factory On the fourth floor of a chocolate factory in Chester, D-Drill got to...

Waycon Precast, Exeter

Waycon Precast, Exeter

Lift shaft panel reduction D-Drill South Wales was asked by Waycon Precast at their location near Exeter to reduce the height...